It is an interesting idea comparing building methods across continents. A common complaint among the Brits is how expensive UK houses are, while at the same time being some of the smallest in the developed world. And why don't they have nice open plan living areas?
Here is a close up of the standard cavity wall:
Yes, we do basically build 2 walls. I think that must be partly why British housing is so small and so expensive. When we were getting quotes from builders, they were using a rough estimate of between £1200-2000 per sq m! So that shows even a pokey little 100sq m house (1000 sq ft ish) is going to cost around £150-200000 to build. Add on the cost of land, in very short supply, and houses do get very expensive indeed!
As mentioned before - this wall method would not be sensible in an earthquake area! I think open plan is wanted here but rarely achieved. Partly I'm sure this is due to the cold climate, as although most if not all houses here are now centrally heated, the majority were converted after being built (ie they were designed without central heating in mind). Most of our housing dates from a time when open plan wasn't trendy either - kitchens were closed off from the living areas and separate formal dining rooms all the rage if you could afford them. This is probably the Victorians' fault! Perhaps even, wanting to emulate the aristocracy by making it seem like the food preparation was being done elsewhere by other people?
The other problem is nearly all our houses are at least 2 stories, again due to land prices, so large open areas downstairs are impossible without expensive steelwork everywhere to hold up the upper floor. As far as I understand, timber joists tend not to span more than about 3m without needing some extra support?
Monday, 26 November 2012
Wednesday, 21 November 2012
Week 3
Rain has halted play here for the last couple of days - the downside of building in November in Britain unfortunately. Still, progress has been made...
The drain for the new WC:
Followed by the floor insulation and a waterproof membrane:
And then a nice concrete floor - finally no more sea of mud!
And so, with the walls most of the way up to the first lift (ie needs scaffolding!), today we have quite an impressive looking, if rather damp, set of walls:
The drain for the new WC:
Followed by the floor insulation and a waterproof membrane:
And then a nice concrete floor - finally no more sea of mud!
And so, with the walls most of the way up to the first lift (ie needs scaffolding!), today we have quite an impressive looking, if rather damp, set of walls:
The Grand Plan!
I notice a lot of interest in the comments about the proposed layout. I appreciate the interest, after all, I have been obsessing over all of these details for over a year now!
So, for those kitchen enthusiasts, here is our current thinking:
And for all those interested, our current working plans for the build:
Ground floor
And first floor:
So, for those kitchen enthusiasts, here is our current thinking:
And for all those interested, our current working plans for the build:
Ground floor
And first floor:
Friday, 16 November 2012
Infra
My lovely mother-in-law took me to the ballet two weeks ago, to see a wonderful triple bill. My favourite was Wayne McGregor's 'Infra', not only for the innovative choreography but also for the haunting score by Max Richter. Amazing dancing. Clare and I are off to the Royal Opera House tomorrow to watch some more ballet, this time a dress rehearsal.
Thursday, 15 November 2012
Kitchen Inspiration
After lots of looking in kitchen showrooms, Pinterest and brochures, this is still our favourite kitchen look - classic Shaker-style units in white with dark worktops and a kitchen island.
This pic is from Ikea, where we'll be getting our kitchen! Well, it's helpful to think big while looking out from my 1960s wooden avocado kitchen held together with duct tape to the foundations outside...
This pic is from Ikea, where we'll be getting our kitchen! Well, it's helpful to think big while looking out from my 1960s wooden avocado kitchen held together with duct tape to the foundations outside...
Wednesday, 14 November 2012
The Big Build - Part 2
So the building work continues...
The foundations were fully dug:
Deep enough to stand in! Definitely a no go area for Marshall now...
Here it all is ready to go looking back at the garden:
Then came the concrete, and suddenly the trenches disappeared again! And suddenly, it looks less like WWI (mud and trenches) and more like an extension.
The final layout is now exposed. It seems quite small when laid out on the ground like this!
And the result at the start of the week - foundations build and ready to go!
This is known in the UK as the level of the DPC (damp proof course). Now for drainage and flooring...
Thursday, 1 November 2012
The Big Build - Week 1
Week one of the Big Build! Time to put the last year of planning into action and extend our little house out into the garden.
First things first, we had to move our old shed out of the way. Above is a garden strewn with shed bits, and below they are starting to go back together again.
Of course, nothing is ever simple, and it soon transpired that the base was half rotted away and needed patching up with some scrap wood.
So then it was the builders turn to do some work - stripping out the concrete (and our beloved pond).
However once they got the mini-digger on site things soon began progressing...
The soil layer is very thin here, and they soon hit solid chalk ground. Good news as it means we get away with minimal foundations (and so no extra money). The builder told me they once had to dig down 4 metres!
It is quite bizarre seeing all that chalk there, never knowing it was there before...
After 2 days of digging they had nowhere left for the soil to go out front, and work stopped until they could get a grabber lorry in...
1 week down - 11 to go... If the weather holds and all goes to plan!