Hooray! The extension is finally drying out...
We have a beautiful set of folding sliding doors on the ground level that can fold back for those warm summer days (if we get any!). We have windows with glass in. And the builders are finishing up the flat roof as we speak. The insulation requirements are crazy now for a flat roof - we now have almost 400mm of roof!! This shows how it is constructed:
We are a lot behind schedule now. But some of the internal rooms have started to take shape as well. We have moved out of our bedroom which has become the next target of the builders:
Here it is, complete with original wallpaper...
Now with window half bricked up and half opened up into a door:
And now with the studwork forming a new corridor through to the master bedroom:
The master bedroom is taking shape too:
On the right is the old pebble-dashed wall of the house, with bathroom and bedroom windows bricked up and the new corridor through the old bedroom visible. The stud wall forms the new ensuite bathroom.
And speaking of bathrooms, we have lost the dividing wall between our bath and toilet, which is well overdue! Probably time to say good-bye once and for all to that lovely floral wallpaper!